Project Description

Client: Tom M. Location: Marysville, WA, US

This

How We Do It

Our first challenge was the concrete subfloor which was in a bad shape. Once we had it all figured out, installation was a breeze. We then glued the floors piece by piece using an adhesive that will stabilize the floor for many years.

Call Now